Southington, CT

Plantsville Elementary School
Newfield is acting as Construction Manager on this 30,000 square
foot “renovate-as-new” school. 17,000 square
feet of additions will be included in this project to provide core
facilities such as gymnasium, media center and cafeteria.
South End Elementary
School
Acting as Construction Manager, Newfield is building a new
46,000 square foot school to accommodate a 300-student population. Classrooms,
gymnasium, cafeteria and all facilities required of a new
elementary school will be built.

Carl M. Small Vo-Ag Center
Acting as Construction Manager, Newfield recently completed
the new Carl M. Small Vocational-Agricultural Center, adjacent
to Southington High. This new 28,000 square foot free-standing
facility is for regional use providing services to young
adults throughout the Southington area. Career building in
the agricultural sciences will be encouraged through state-of-the-art
laboratory and greenhouse facilities. Specialty areas include
plant science, aquaculture, floral design, large and small
animal care, biotechnology, agriculture mechanics shop for
farm equipment repair and agriculture business management.
In addition to this project, Newfield built a 4,300 square
foot cafeteria addition to the existing High School for Vo-Ag
student use and seven new tennis courts.

Strong & Hatton
Elementary Schools
Newfield Construction was brought in to complete the renovations
and additions at these two elementary schools. The school’s
previous contractor closed their business, leaving the bonding
company to select a firm to finish the work. Newfield was
brought on as a Construction Manager and worked diligently
to regain control of the project, project site and complications
brought on by this unfortunate circumstance. Newfield met
our schedule and budget in bringing these projects to fruition.
The two-story Strong School required a 27,000 square foot
renovation and 28,000 square foot addition of steel and masonry.
The one-story Hatton School also required renovation of 27,000
square feet plus a 47,000 square foot addition. The school
was occupied with students during the renovation process. This
project touches every aspect of renovations and was completed
in 13-phases, minimizing educational disruption.